
Hohhot East Railway Station is the second largest train station in Inner Mongolia Autonomous Region. Hohhot East Railway Station started construction since September 2006. In 2010, after the 4 years construction, the large modern passenger terminal was formed. East Station with a total construction area of nearly 100,000 square meters, has six stations, 30 ticket windows, and its waiting area is 5 times bigger than the original train station. General layout sets 7 arrival-departure tracks, 2 truck departure lines, 2 main lines, and 3 intermediate platforms. At the western end of the platform, there is a five-meter-wide parcel authentic one. Station house has 24 lifts and the station can hold a maximum number of up to 10,006 persons.
|
English Name:
|
Hohhot East Railway Station
|
|
Chinese Name:
|
呼和浩特东站
|
|
Location:
|
At east part of Hohhot, 8.7 km away from Hohhot railway station
|
Editorial accountability
Hu Lei, CEO. The named owner is responsible for travel-planning accuracy and escalation of time-sensitive checks.
Yuntian Travel (Yunnan) Group is identified in its corporate profile as a licensed professional inbound travel service provider based in Kunming, China. Registration and travel-service documents can be requested before booking.
Page-specific references where cited, official destination, transport and entry notices, YUNSKY route-planning records, and direct provider confirmation before a booking is finalized.
Content is reviewed when rules, transport, access, pricing or route conditions change. Final availability and operating details are reconfirmed for each traveler’s dates.
Quality review: Page updated: